ATEC Pharmatechnik faced a major challenge: rising costs for technical gases were placing a considerable strain on production. However, ATEC found a solution together with the ERA Group. With ERA's expertise and targeted negotiations, savings of 55% were achieved on a budget of €95,000!
Download the case study here now


















































































