No items found.
No items found.
No items found.
All case studies

Reliability, Predictability and $198,000 in Savings

Content

I'm going to be the URL to copy

When undertaking a review of the client's Fleet, ERA defined all of the requirements. We examined different options and then present them in such a way as to make your decision making simple.

Our review seeks to balance the three elements of fleet management:

• Acquisition and length of operating term

• Fleet Operational Management, and

• Financing of the fleet

The fleet had 100 vehicles; a mix of utilities, SUV’s, wagons and sedans, some of which required trailers to be towed reasonably regularly. The fleet operating policy had consisted of buying vehicles based on price and then running them until they could no longer perform the task for which they were required. This had resulted in an aging fleet with compromises being made in the way they were operated. They also had a policy of short-term leasing for sales and managerial vehicles for which quotes were sought as and when vehicles were required.

From ERA’s review of the fleet requirements, it was established that most of the tasks had similar vehicle specifications, which was different from previous perceptions. It was identified that the utility vehicles needed to have a higher load carrying capacity than was current and also to have a better passenger carrying capacity. Selected potential suppliers were approached and requested to provide solutions. These were compared and contrasted with the current scenario.

ERA’s analysis identified that changing the profile of the fleet by acquiring double-cab utilities except where an alternative was demonstrably necessary, allowed usage to be evenly spread over the fleet and for all tasks to be catered for effectively. The most cost-effective term of operation was identified, and the differences between leasing and ownership fully cost.

"The end result was a fleet focused on the business requirements under fully maintained operating leases, a coherent fleet management plan and the cost of acquiring and operating their fleet reduced by $198,000 per year on full implementation. This represented a 40% reduction."

Related case studies

You might also like

Fripa - Procurement Support in a Volatile Market

HANNA Feinkost Achieves 33% Savings Through Reassessment

How ENNI is restructuring its supplier base

Bavarian butcher shop achieves savings on food purchases

Sporthaus Schuster Optimizes Packaging Logistics

Successful Cost Optimization in the Packaging Sector

Jenaer Antriebstechnik saves 20% on insurance premiums

All Service Group sustainably reduces costs for operating its printer fleet

Optimizing Scrap Revenue at OMS Antriebstechnik

Sustainable Reduction of Energy Costs at OBJECT CARPET GmbH

POS digitizes incoming invoices

Kölle GmbH Significantly Increases Revenue Through Scrap Proceeds

BAUER Maschinen GmbH is repositioning itself in the temporary staffing sector

JOB GmbH Reduces Insurance Costs

ZERA GmbH Reduces Procurement Costs

Hannover Airport Digitizes Shopping

ADAC Driver Safety Center Lüneburg

Jewish Community of Berlin Achieves Annual Savings of 343,000

Large medium-sized company and manufacturer of composite films optimizes raw material procurement

BAUER Group Optimizes Steel Procurement

Swiss Red Cross Restructures Licensing Costs

Peter Kaiser

Ervin Amasteel

FIMAK Group

Hospitality & Leisure

Grupo Martí: Optimizing Costs to Strengthen Financial Resilience

Professional Services

ERA Group helps Catholic Charities of Denver put millions back towards mission

How TEM Catez Achieved 19% Packaging Savings with ERA Group

How ERA Group Helped Camira Fabrics Save Over £2.8 Million: A Directors Guide

Professional Services

From Cost Pressure to Clarity: The Story Behind ManpowerGroup’s 20% Savings

Healthcare

Precision in Partnership: How Esaote Saved €660,000 in Annual Savings

Scaling Smarter: How TTI Transformed Logistics, Packaging, and Sustainability with ERA Group

Blank sheet to ‘Super Warehouse’: Brigade Electronics partners with ERA Group to help transform their European Logistics Operations

How Swedish Match Saved 26% on Global Freight Costs

NEURA reduces telecommunications costs by 34 per cent

Historic inn lowers food cost, saves on merchant card fees

Automated Packaging Systems (Autobag)

Professional Services

SATO UK

Rail Delivery Group (formerly ATOC)

Belzona Polymerics

Wharfedale

Max Gear restructures its market operations with an eye on non-strategic costs

Wharfdale

Whale Pumps

Education

West Herts College

Wartsila

Wesleyan Assurance Society

Association for Nuclear Process Engineering and Analytics e.V. reduces costs for technical gases

Vision Alert

Professional Services

Vale Europe Ltd

Healthcare

Unity Care Northwest adds $1M funding to its mission

Healthcare

Unicare Pharmacy

UK Flooring Direct

TTI Inc. optimises telecommunications costs

Trane

Education

University calls on ERA Group to improve telecom spending

Leading toy retailer unboxes 23% savings on shipping costs

Tiendanimal

Schüco

Caribbean Shipping

TJ Transport

GB Ingredients

Kuipers - Netherlands - FR

Amoobi

Education

School cuts cleaning costs by 49%

Würzburg District Office reduces costs for natural gas purchases

Reductions of up to 40% in freight costs for Renner

Education

Royal Hospital School

Education

Royal Academy of Dance

COSMOQUÍMICA optimises distribution logistics and security infrastructure

Improving Club Sustainability through Cost Optimisation

Healthcare

National Pharmacy Association

Midas Group

Millbrook Garden Company

Healthcare

Barraquer

King Baudouin Foundation - Belgium - EN

La Fondation Roi Baudouin - Belgique - FR

Jewish Community of Berlin achieves savings of £343,000 per year

Professional Services

The Huber Group sweeps up $30K in annual savings

Handelshof Group reduces costs for Microsoft licences

Education

Doing the math: Foote School saves $69,100

Bauhaus

Historic Inn and restaurant served up $350K savings

Family Planning Association

PDC Brush - Belgium - EN

Education

Trinity College

Birmingham Symphony Orchestra

British Lung Foundation

BAUER Group optimises steel purchasing

Finnveden

Anfi Group

Oerlikon HRSflow

Salto Systems

Professional Services

Ten Alps Publishing

Takasago optimises cost management

BAUER Maschinen GmbH repositions itself in the temporary employment sector

Swiss Red Cross restructures licence costs

Healthcare

Supplemental Health Care resuscitates $1.2M for its bottom line

Swiss company Avesco AG reduces cleaning costs

Uniform Expenses: ERA Review Process Outlines Savings Opportunities

Local supplier provides better cost-benefit ratio